Primavera P6 16.2.3 Patch Now Available
The 16.2.3 patch set is now available on Oracle Support, Patch ORACLE PRIMAVERA P6 EPPM 16.2.3.0
The following Oracle Support issues have been resolved:
WEB
| 25258504 | ACTIVITY CODE COLUMNS AUTOMATICALLY RENAMED IN ACTIVITIES VIEW |
| 25120783 | DATA_MONITOR REMOVING PX DATA FOR ROLE ASSIGNMENTS WITHOUT RESOURCES |
| 25258482 | ACTIVITY COLUMN WIDTHS DO NOT SAVE IN P6 WEB |
| 25258479 | MULTIPLE GENERAL TABS APPEARING IN ACTIVITIES VIEW DURING EDITING |
| 23340424 | WHEN SELECTING ACTIVITY VIEW IN P6 WEB USERS ARE REDIRECTED TO DASHBOARD VIEW |
| 20445056 | DATA DOES NOT SAVED OR DISPLAYED CORRECTLY IN RESOURCE PLANNING VIEW. |
| 25257677 | ERROR WHEN CONVERT AN EPPM DB TO PPM DB OR A PPM DB TO EPPM DB |
| 25077089 | DEFAULT UNITS/TIME INCORRECT PERCENTAGE INPUT |
| 23602160 | MESSAGE DIFFERENCE WHEN CUT/PASTE PROJECT WITH EPS LEVEL ACTIVITY CODES |
| 25258483 | GLOBAL SCHEDULED SERVICES NAMES NOT TRANSLATED FROM ENGLISH TO DE/FR/IT |
| 24470557 | DEFAULT PUBLICATION SETTING TIME DISTRIBUTED INTERVAL=WEEK NOT SAVED IN DB |
| 25295114 | TEXT OF DESCRIPTION FIELD OF FUNDING SOURCE P6 WEB SHOW AS HTML FORMAT |
| 25258484 | IMPORTING PRIMAVERA XML THROWING AN INVALID VALUE WAS DETECTED FOR CALENDARJSON |
| 25111536 | PROJECT ID, PROJECT NAME DO NOT GET ROLLED UP AT THE WBS |
| 25026514 | REPORT FORMATTING NOT CONSISTENT FOR MS EXCEL IN STANDARD REPORTS |
| 24689843 | WEB ACTIVITIES STANDARD VIEW NOT SHOWING WBS SUMMARY BAR LABELS. |
| 22187320 | P6 WEB START DATE IS DISPLAYED FOR FINISH MILESTONES AND VICE VERSA |
| 25296935 | RESOURCE ADMINISTRATION (HTML VIEW) SETTINGS TAB IS READ ONLY |
| 25287824 | DISCUSSION CONTENT OF ACTIVITIES DOES NOT SHOW (IT SHOWS BLANK) |
| 25124524 | COMMENTS ARE NOT VISIBLE WHEN LOGGED IN WITH NON-ENGLISH LANGUAGE IN ACTIVITIES |
| 24955536 | INCONSISTENT BEHAVIOR IN WBS BANDS WHEN A FINISH DATE HAS AN ASTERISK IN HMTL5 |
| 23732146 | THE PLANNEDVALUELABORUNITS NOT UPDATED AFTER CHANGE IN PROJECT BASELINE ASSIGMNT |
| 25139227 | TRANSLATION STRINGS ARE NOT AVAILABLE FOR OTHER LANGUAGES OF BUG 24836607 |
ADMIN
| 25028216 | ORA-06508: PL/SQL: COULD NOT FIND PROGRAM UNIT BEING CALLED: ADMUSER.PRM_PAUDIT |
| 25302997 | P6 LOG-IN ISSUE USING MIGRATED ORACLE DB FROM PPM TO EPPM |
| 25238985 | APPLICATION SETTINGS MISSING AFTER MIGRATION FROM PPM TO EPPM THEN UPGRADATION |
| 24764661 | AFTER CONVERTING EPPM TO PPM DATABASE SCHEMA, PRIVUSER PASSWORD MUST BE UPDATED |
| 24477697 | APPLICATION SETTINGS ARE MISSING AFTER MIGRATION FROM PPM TO EPPM |
INTG
| 25258487 | ERROR: INVALID FIELD CHECKBOXCOLUMN FOR PROJWBS WHEN SEND TO UNIFIER FROM P6 |
SRVS
| 25258488 | PROJECT ARBITER GETS STUCK IN RUNNING MODE WHEN THE DB CONNECTION GETS RESET |
BOS
| 25291984 | ERROR NO SUCH COLUMN: WORKDATE CREATING RESOURCEHOURS USING P6 WEB SERVICES |
| 25119800 | NO SUCH COLUMN: RESOURCETYPE CALLING CREATERESOURCEASSIGNMENTPERIODACTUALS |
TM
| 25237085 | HOURS MOVING BACK 1HR DUE TO DAYLIGHT SAVINGS NOT WORKING IN TEAMMEMBER |
| 25144356 | TEAM MEMBER TIMESHEETS SLOW SAVING ACTIVITIES |
| 24824453 | SINGLE TEAM MEMBER USER TAKES UPWARDS OF 5 MINUTES FOR THE TASKS TO LOAD |
| 25074815 | COMPLETE TASK APPEARS IN 'ADD EXISTING TASK TO TIMESHEET' FROM TIMESHEETS |
| 23620100 | TIMESHEETS ALERT: CURRENT TIMESHEET PERIOD DOES NOT EXIST |
P6 PRO
| 25333114 | VISUALIZER CHANGING GANTT CHART OUTPUT SIZE / ASPECT RATION IN PRINT PREVIEW |
| 25323069 | FAILURE MIGRATION OF A P6 DATABASE SCHEMA FROM P6 PROFESSIONAL TO A P6 EPPM DATA |
| 25303305 | COPY/PASTE OPERATION LOCKING NEXTKEY TABLE USING SQL SERVER DATABASE |
| 25302553 | UNIQUE CONSTRAINT (ADMUSER.PK UACCESS) VIOLATED MESSAGE WHEN LOGGING INTO P6 |
| 25258492 | TOTAL ACTIVITIES COLUMN IS NOT UPDATED AFTER COPYING AND PASTING A PROJECT. |
| 25258491 | COPYING AND PASTING A SCHEDULE INTO A NEW EPS CREATE MULTIPLE CODES |
| 25258480 | SLOW PERFORMANCE WHEN DOING SUMMARIZE PROJECT |
| 25245904 | XML IMPORT ERROR SEVERE: UNABLE TO CONVERT VALUE PARAMETER (0,0) TO VALID DOUBLE |
| 25245787 | MEMORY NOT BEING RELEASED IN P6 PROFESSIONAL AFTER CLOSING PROJECT DATA |
| 25245785 | E-MAIL PROTOCOL CHANGES IN P6 PROFESSIONAL |
| 25245784 | BASELINE NAME INCORRECT IN BASELINES TO EXPORT WINDOW W/ EXPORT WITH XML |
| 25211675 | INVALID LOGIN NAME OR PASSWORD ERROR ON LOGIN IF CASE IS NOT MATCHED WITH DB |
| 25306345 | PERF: EXCEL IMPORT MAKES 3 REQUESTS FOR EACH ROW INSERTED OR UPDATED |
| 25140250 | XER IMPORT PERFORMANCE DURING 'IMPORTING ACTIVITY CODE VALUE' WINDOW |
| 24970850 | INVALID USERNAME OR PASSWORD, P6 PRO CONFIG W/ 'ENABLE CLIENT-SIDE CACHE' |
| 24742782 | MIGRATE.BAT FAILS TO UTILIZE NON-DEFAULT TABLESPACE NAMES IN TARGET DATABASE |
| 24712157 | MIGRATE.BAT TO ORACLE DB FAILS IF TEMP TABLESPACE IS ANYTHING BUT TEMP |
| 24712017 | PPM MIGRATE.BAT UTILITY DOES NOT USE CUSTOM ROW BATCH SIZE TO COMMIT INTERVALS |
| 24606609 | 'CHART BOX TEMPLATE' DOES NOTHING WHEN SELECTED FROM THE PROJECT TABLE VIEW |
| 22579321 | ALTER TABLE STATEMENT CONFLICTED WITH THE FOREIGN KEY MIGRATING SQL DB |
- Last updated on .