Oracle Primavera Patch 16.2.6 Now Available

As of April 2017, Oracle Primavera P6 EPPM 16.2.6 is now available.

The following Oracle support issues have been fixed with this new patch:


WEB

Bug IdTitle

24337536

DIFFERENT DATES AND TIMES IN THE STANDARD AND CLASSIC VIEW

24740250

ACTUAL START/FINISH DATES DO NOT MATCH IN THE STANDARD AND CLASSIC VIEWS

25384683

DIFFERENT DATES SHOW IN CLIENT AND WEB FOR THE SAME WBS

25483034

NO ABILITY TO SELECT ALL FROM REPORTS IN P6

25483714

STACKED HISTOGRAM BY PROJECT CODES SHOWING REPEATING CODE NAME / DESCRIPTION

25498021

P6 REPORT FIELDS DON'T AUTO POPULATE WHEN PROJECT FIELD IS SELECTED

25513737

UDF TEXT FIELD VALUE CANNOT EXCEED 120 CHARACTERS

25536058

CELL APPENDING VALUE NOT OVERWRITING

25559110

FINISH MILESTONES SORT INCORRECTLY BY THE START DATE

25562253

UNABLE TO SAVE CHANGES ON FINISHED CHECKBOX FOR FINISH MILESTONE WHEN UNCHECKING

25582245

MILESTONES DONT SHOW ON STANDARD VIEW GANTT

25596802

CRITICAL PATCH MISSING IN GANTT CHART STANDARD VIEW

25606304

CASCADING PARAMETERS NOT REFRESHING WHEN RUN FROM P6 WEB

25615073

CREATING A SECOND FINANCIAL PERIOD IN AN EMPTY DATABASE THROWS ERROR

25633079

VIEW SERVICE STATUS SCREEN DOESNT LOAD

25634748

SOME OF THE FORMULA OF PROJECT UDFS IS NOT RECOGNIZED IN P6 KOREAN

25644803

CANNOT IMPORT PRIMAVERA XML INTO P6 WEB

25645377

ERROR TRYING TO SAVE ACTUAL FINISH DATE ON MILESTONES IN HTML 5 VIEW.

25681979

ADMINISTER MENU DOES NOT COLLAPSE WHEN DIFFERENT MENU ITEM IS CLICKED

25794222

RISK THRESHOLD LOWEST VALUE NOT UPDATING WITH CHANGES TO VALUE ABOVE

25673898

REMOVAL OF FUSION INTEGRATION FROM ADMINCONFIG CAUSING WEBACCESSLOG ERRORS

TM

25341233

PRIVILEGES TO REJECT TIMESHEETS DON'T WORK IN 16.2 THAT WORKED IN 8.2.

25498845

TIMESHEET APPROVALS DISPLAYING UNUSUAL NUMBER OF DECIMAL POINTS IN TOTAL HOURS

25515600

STEPS NAME CHANGES TO SOME MEANINGLESS TEXT IN TM

25543680

P6 MOBILE LINK TO EMAIL DOES NOT WORK FROM GET MOBILE PAGE

25192422

TIMESHEETS ADD EXISTING TASK SLOW AND INCONSISTENT BEHAVIOR

INTG

25438080

UPDATE UDF COSTS DO NOT GENERATE EVENTS

25761669

ERROR WHILE SENDING SUMMARY DATA FROM P6 TO UNIFIER VIA GATEWAY

SRVS

25673866

THE UPDATERESOURCEASSIGNMENTPERIODACTUALS SERVICE DOES NOT UPDATE THE ACTIVITY.

25673980

P6.EAR JVM RUNS XML IMPORT/EXPORT WHEN ENABLE ALL SERVICES SET TO FALSE

25727590

APPLY ACTUALS JOB INTERMITTENTLY STUCK IN A RUNNING STATE

25773685

DATA DATE IS NOT ADVANCED APPROPRATELY WHEN SELECTING RUN SERVICE

P6 PRO

25770343

A QUESTION MARK SYMBOL (?) IS PREFIXED TO NOTEBOOK AFTER PATCHED TO 15.2.11.0

25760251

PROJECT PORTFOLIO IS NOT CHANGING AFTER BEING SELECTED

25724629

ENTITIES NOT PRESENT IN SOURCE PROJECT ARE NOT SHOWN IN SCHEDULE COMPARISON

25643137

PERFORMANCE ISSUE LOADING RESOURCES WHEN BEING ADDED TO AN ACTIVITY

25509899

ORA-01460 WITH PROJSHAR_INSERT_MULTIPLE_IDS

25253621

ORA-00904 ERRORS IN VISUALIZER.LOG CREATING TSLD OR GANTT

25208434

COLOR BAND NOT UNIFORM ACROSS RESOURCE ASSIGNMENT TABLE AND SPREADSHEET FIELD.

25079094

SCHEDULE COMPARISON RESULTS ARE COMPLETELY OPPOSITE TO WHAT IS IN THE SCHEDULE

24925402

LAYOUT CONTAINING CYRILLIC CHARACTERS INCORRECTLY DISPLAYED

23295919

INCORRECT CYRILLIC CHARACTERS IN PROJECT EXPORT, GLOBAL CHANGE, PRINT PREVIEW

23295302

CYRILLIC CHARACTERS ISSUE AFTER UPGRADING TO EPPM 15.2

25808561

COPY/PASTING PROJECT INTO EMPTY EPS RESULTS IN PROJECT BEING CHECKED OUT

25545057

THE PASSWORD ENTERED DOES NOT MATCH THE EXISTING PASSWORD FOR USER PRIVUSER