Oracle Primavera P6 Patch 16.2.7 Released
The latest patch for Primavera P6 is now available. Below are the issues that have been resolved with version 16.2.7.
WEB
| 25607708 | P6 WEB RECALCULATES ASSIGNMENT COSTS RESULTS INCORRECT |
| 25897583 | ERROR WITH UPDATE EXISTING XML IMPORT [OBJECT OBJECT] - THIS IS A REQUIRED FIELD |
| 25895582 | UNDER RESOURCES TAB SEARCH FILTER IS NOT REMOVED |
| 25886473 | PROJECT CODES - WEB |
| 25864136 | NO ABILITY TO SELECT ALL FROM REPORTS IN P6 |
| 25841989 | INTERNAL-FP:25797617:SERVER RETURNED HTTP RESPONSE CODE: 504 LOADING GLOBAL ACTI |
| 25835069 | COPY/PASTE AND LETTER V ARE NOT ACCEPTED IN RISK CATEGORY |
| 25823565 | ERROR "THE SELECTED DATES CREATE A GAP IN THE FINANCIAL PERIODS ... OCCURING |
| 25806788 | DBENGINE ERROR WHEN ENTERED VALUE IS MORE THAN MAXIMUM VALUE FOR RISK THRESHOLD |
| 25802582 | UNABLE TO IMPORT MSP XML WHEN NO TEMPLATES EXIST |
| 25773235 | CANNOT ADD PROJECT IN STANDARD VIEW |
| 25756815 | CHANGING ACTIVITY TYPE REMOVES ALL ACTIVITIES RELATIONSHIPS. |
| 25742903 | EPS GROUP BAND UDF DATE FIELDS BLANK OUT WHEN SWITCHING |
| 25731219 | USER ADMINISTRATION EXPORT CONTAINS TRAILING CHARACTER |
| 25716178 | PXRPTUSER.PROJECT.SUMACTUALFINISHDATE HAS VALUE WHEN |
| 25713464 | SET TIMESHEET MANAGER FOR RESEARCH FAILS WHEN THERE ARE MANY USERS |
| 25690059 | CANNOT DISPLAY PREDECESSOR OR SUCCESSOR COLUMNS |
| 25661110 | BASELINES NOT GETTING PUBLISHED TO WBSHIERARCHY TABLE |
| 25449050 | NOTEBOOK DESCRIPTION DOES NOT SUPPORT MULTI BYTE CHARACTERS |
| 25359402 | SUMMARY BAR SETTING IN STANDARD VIEW SETTING NOT WORKING PROPERLY. |
| 25204899 | PLANNED DURATION FOR RESOURCES ARE DISPLAYING VALUES BEHIND THE DECIMAL |
INTG
| 25944061 | FP: GATEWAY - P6 ADAPTER DOES NOT ALLOW WRITE ON "ACTIVITYSTEP FOR PROJECT |
| 25702513 | UDFVALUE UPDATE MESSAGES ARE NOT BEING GENERATED |
SRVS
| 25581283 | ROW LOCK `ENQ: TX - ROW LOCK CONTENTION' CAUSING PROJECT SUMMARIZATION SLOW |
| 25565842 | PUBLISH RESOURCE MANAGEMENT SERVICE FAILS WITH ERROR ORA-06502 |
| 25834626 | FP :UPDATEBASELINEOPTIONSERVICE OPERATIONS ERROR 'OBJECTID IS NOT A VALID FIELD' |
API
| 24968647 | P6 API - ACTIVITY CREATE - INVALIDCLASSEXCEPTION: SERIALVERSIONUID MISMATCH |
TM
| 25823581 | TEAM MEMBER, STEPS ARE NOT SHOWN IN THE ORDER THEY ARE ADDED IN THE CLIENT |
P6PRO
| 25290789 | CVC-DATATYPE AND CVC-TYPE ERRORS STILL EXIST IN MSP XML EXPORT |
| 25549475 | ACTIVITIES DELETED FROM BASELINES DURING UPDATE |
| 25797663 | ERROR IMPORTING XLSX 'EST_WT COLUMN IS NULL' AFTER 16.2.5.0 UPGRADE |
| 25916866 | VISUALIZER - PERFORMANCE DEGRADATION WHEN DRAWING A SECOND TSLD WITH LINES |
| 25911671 | P6PRO CRASHES AFTER MOMENTARY NETWORK INTERRUPTION WITH CLOUDCONNECT |
| 25888855 | ISSUE WHILE RUNNING MULTIPLE REPORTS SECOND TIME/REPLACE OLD FILES |
| 25888830 | IMPORT XLS WILL DUPLICATE ROLE ASSIGNMENTS |
| 25888799 | CHANGES PICKED UP WHEN MERGING REFLECTION TO SOURCE WHEN NOTHING |
| 25888603 | SLOW DRAWING/SCROLLING OF PROJECT VIEW DUE TO DATABASE CALL FOR EACH ROW |
| 25866662 | INTERNAL PLUGINS FAIL WHEN USER EXISTS IN OU WHERE # IS FIRST CHARACTER OF OU |
| 25862025 | PROJECT ID CONTAINING FORWARD SLASH RESULTS IN XML EXPORT FAILURES |
| 25852742 | LAYOUTS BELONGING TO UNOPENED PROJECTS SHOWS UP IN OPEN LAYOUT DIALOG |
| 25840073 | INTERNAL-FP: 25091337: XML EXPORT FAILS WITH SEVERE: DBENGINE.EXECUTESELECT |
| 25823623 | PHYSICAL % COMPLETE ENTRY IS SET TO 0% AFTER XML IMPORT INTO AN EPPM DATABASE |
| 25822661 | XML EXPORT FAILS WITH SEVERE: DBENGINE.EXECUTESELECT |
| 25815291 | COPYING A CHECKED OUT PROJECT LEAVES THE RESULTING PROJECT CHECKED OUT |
| 25808692 | LOGIN ISSUE: APPLICATION AND DATABASE VERSIONS DO NOT MATCH ERROR |
| 25759157 | PERFORMANCE: DELETING A WBS CAUSES MANY INEFFICIENT CLOUDCONNECT REQUESTS |
| 25700339 | XML FILE CAN'T BE DOWNLOADED DUE TO '&' IN PROJECT NAME |
| 25670568 | INTERMITTENT AVAA0 ERRORS WHEN CHANGING LAYOUTS |
| 25520960 | ERROR ADDING EXTERNAL APPLICATION LINK TO TOOLS MENU FOR EPPM DATABASE |
| 25333413 | AFTER UPGRADE FROM 15.2 TO 16.2 P6 PROFESSIONAL IS NOT WORKING THROUGH SAML |
- Last updated on .