P6-Scrubber v8 - New Release

P6-Scrubber v8 - New Release

In version 8.0, we have introduced quality assurance checks, data analysis and auto-scrubbing. Choose from pre-defined validations and create your own to match your company's needs with configurable warn/fail checks. Peruse sleek and responsive reports to see any potential issues in your projects or activities, all bundled together with regular scrubbing capabilities. Dig into schedule details with our project statistics dashboards.

Read more

CAPPS - v14 Release

CAPPS - v14 Release

Introducing CAPPS Version 14.0.

This new version introduces crosstab views, a Gantt chart tab, and Project Data Dashboards. Crosstab views are perfect for project managers, offering quick and easy activity and step progression that can even be done from your phone or mobile device. The Gantt chart allows for a complete view of your activities along a timeline, right from inside CAPPS. Finally, check out our new project data dashboards, built specifically for project managers.

Read more

Upcoming Free Webinars

Upcoming Free Webinars

Upcoming Webinars - Register Now to Join!
  • P6-Scrubber v8 New Release - March 10, 7-8pm MDT
  • P6-Scrubber v8 New Release - March 11, 9-10am Philippine Standard Time
  • BI-GanttView - March 18, 10-11am MDT
  • CAPPS v14 New Release - March 26, 10-11am MDT
  • OPC-Integrator - April 1, 10-11am MDT

Read more

Upcoming Online Training

Upcoming Online Training

Join one of our upcoming, live online training courses for Primavera P6, OPC or Safran Risk.
  • Introduction to OPC - Jan 21-22
  • Primavera P6 Basic - Jan 26-30
  • Primavera P6 Advanced - Feb 9-11
  • Administration in OPC - Feb 18-19

Read more

CAPPS - v13 Release

CAPPS - v13 Release

Introducing CAPPS Version 13.0

Version 13 of CAPPS comes with a completely redesigned and easier to use UI, sophisticated team and user management, better filter and layout management, improved business rule processing in the grid, performance improvements, and more.

Read more

P6-Scrubber v7 - New Release

P6-Scrubber v7 - New Release

In version 7, we added support for scrubbing role codes, revamped the simple scrub dialog (and added new simple scrub areas), and added the ability to apply a dynamic prefix to both IDs and hierarchies in the simple scrub area.

Read more

P6-Loader v15 - New Release

P6-Loader v15 - New Release

In this release of P6-Loader v15, Emerald has added additional UDF merging options for better control. Layouts and filter controls have been greatly expanded, with a layout usage sheet and loader sheet to deal with user layouts. Resources can now be remapped when copying layouts.

Read more

CAPPS - v12 Release

CAPPS - v12 Release

Introducing CAPPS Version 12.0

Version 12 of CAPPS comes with a variety of new features and improvements, including greater grid functionality and adaptability, better clarity, and the addition of a baseline development tab.

Read more

Unifier v24 - New Release

Unifier v24 - New Release

The new Unifier v24.12 update adds significant new features and improvements to make the user experience smoother and easier, including changes to integration, documents and attachments, importing data, the mobile application, and many more.

Read more

P6 v24 - New Release

P6 v24 - New Release

With the new release of P6 v24 comes a flood of enhancements and new features that make P6 better and easier to use than ever! From a new, simple way to unlink your activities in P6 Client, to a whole new view for timesheets in Team Member, take a look at a few of our favorite new additions.

Read more

P6-Loader v14 - New Release

P6-Loader v14 - New Release

Better resource assignment and unique loading options, record action column, and backup of layouts

Read more

P6-Loader v13 - New Release

P6-Loader v13 - New Release

Easier Hierarchies and Fragnet Templating

Read more

P6-QA v8 - New Release

P6-QA v8 - New Release

Your P6-QA metrics are now available in Power BI reports. You can also create custom reports via our P6-Reporter tool in your corporate dashboards. These reports include time based metrics to help you see where in your project these quality issues exist.

Read more

P6-Calculator v7 - New Release

P6-Calculator v7 - New Release

Easily Manage Key Resources and Mandatory Activities in P6!

Read more

Safran Risk v22.2.0 - New Release

Safran Risk v22.2.0 - New Release

Safran Risk has released v22.2.0. Read about all the exciting new features.

Read more

P6-Auditor v5 - New Release

P6-Auditor v5 - New Release

Our latest version of P6-Auditor has a new look and feel making auditing definitions easier and faster to build.

Read more

Safran Risk v22.1.0 - New Release

Safran Risk v22.1.0 - New Release

Safran Risk has released v22.1.0. Read about all the exciting new features.

Read more

P6-Scrubber v6 - New Release

P6-Scrubber v6 - New Release

In version 6, we added notebook type scrubbing and also made improvements to the P6-Scrubber user interface, reports and functionality in general.

Read more

P6-Calculator v6.4 - New Release

P6-Calculator v6.4 - New Release

Easily Manage Key Resources and Mandatory Activities in P6!

Read more

P6-Scrubber v5 - New Release

P6-Scrubber v5 - New Release

Work online or offline to define and scrub your XER files and now, in the new release, XML files. Version 5 makes scrubbing files even easier for schedulers.

Read more

Oracle Primavera P6 21.12.6.0 Released

IMPORTANT UPDATE: The major patch 21.12.6.0 for P6 EPPM is now available. The following list of issues have been fixed for Primavera. To see the other released patches and updates for P6 EPPM v21.12, please visit My Oracle Support.

WEB


34223794 BUG 34219132 - SPREAD TASK REQUIRES CALLING LOGIN TASK PRIOR WHEN AUTHENTICATION MODE IS SET TO OAUTH.

34208075 INTERNAL-FP:SOME RESOURCES, WHICH ARE NOT OVERALLOCATED, HAVE AN EXCLAMATION MARK RIGHT NEXT TO THEIR RESOURCE ICONS

34196506 BP-LOADING ASSIGNMENTS VIEW WITH A UDF COLUMN AS A NON-SUPERUSER EXECUTES STATEMENT TO LOAD ALL PROJECT AND WBS ELEMENTS WHICH CAN TRIGGER A DELAY IN SEVER SIDE CODE EXECUTION

34179151 21 BP - P6 EPPM APPROVALS > STATUS UPDATES TAB NOT LOADING WHEN PENDING CONSTRAINT DATE CHANGE EXISTS BUT CONSTRAINT WAS REMOVED FROM ACTIVITY

34164143 21 FP - SET PROJECT PREFERENCES AT THE EPS NODE, THE SETTINGS ARE NOT BEING FULLY APPLIED TO THE PROJECTS UNDER THE NODE

34018389 ACTUAL LABOR UNITS ARE RESET TO ZERO AFTER SCHEDULE (F9) IN P6 PROFESSIONAL

Team Member

34192816 TEAM MEMBER NOT WORKING WHEN USING SSL DATABASE CONNECTION - IO ERROR: RECEIVED FATAL ALERT: HANDSHAKE_FAILURE

SRVS

34174623 FP - IMPORT PRIMAVERA XML FAILS FOR SQL SERVER VIA WEBSERVICES

34173923 ERROR ON PRIMAVERA WEB SERVICE

P6PRO

34100325 CONSTRAINT DATE TIME REVERTS TO 00:00

34003439 UNEXPECTED CENTURY DATE DISPLAYED WHEN USING 2-DIGIT YEAR

34198485 21 FP - UTF-8 IS GETTING ADDED TO NOTEBOOK DESCRIPTIONS AFTER XML IMPORT

34179563 INTERNAL-FP:FAILED TO LOAD IMPORTOPTIONSTEMPLATE DATA WHEN IMPORTING PRIMAVERA XML

34169582 AFTER UPGRADE FROM VERSION 16.1 TO 20.12, CURRENT WEEK (CW) FILTERS ARE DEFECTIVE

34123354 EXPECTED FINISH CHANGES AUTOMATICALLY WHEN IT IS SELECTED

33947353 [ALL ENV] PUBLISH ENTERPRISE DATA RESOURCES OPTION DISABLED AFTER UPGRADE ALWAYS

34119816 VTFIO-0682-C WHEN CREATING A REFLECTION

Oracle Primavera P6 19.12.19.1 Released

IMPORTANT UPDATE: The interim patch 19.12.19.1 for P6 EPPM is now available. The following list of issues have been fixed for Primavera. To see the other released patches and updates for P6 EPPM v19.12, please visit My Oracle Support.

34166644 XER IMPORT/EXPORT NOT IMPORTING OR EXPORTING CALENDAR EXCEPTIONS, NOTEBOOK DESCRIPTIONS WHEN DATA ELEMENT EXCEEDS 4096 CHARACTERS

Oracle Primavera P6 20.12.14.0 Released

IMPORTANT UPDATE: The major patch 20.12.14.0 for P6 EPPM is now available. The following list of issues have been fixed for Primavera. To see the other released patches and updates for P6 EPPM v20.12, please visit My Oracle Support.

WEB

34017825 BP - IMPORT XML RUNS FOR LONG TIME AND OFTEN FAILED WITH TIME OUT

34008984 UNABLE TO DELETE USERS IN P6 EPPM 20.12.14.0

34002791 AFTER UPGRADE FROM VERSION 16.1 TO 20.12, CURRENT WEEK (CW) FILTERS ARE DEFECTIVE

33996383 INTERNAL-FP:BASELINE ASSIGNMENTS LOST AFTER IMPORTING PRIMAVERA XML

33963667 PUBLISH JOB CRASH WHEN IT LOADS A HALF DELETED PROJECT WITH NULL PROJWBS DATA

33916262 JAVASCRIPT CODE CAN EXECUTE THE /P6/REST/DICTIONARIES/LOAD/FINANCIALPERIODS REQUEST PASSING AN INVALID PARAMETER VALUE (TEMPLATEID=UNDEFINED)

33896379 CONTAINS FUNCTION NOT WORKING FOR FILTERED PORTFOLIO

33885625 FILTERS THAT CONTAIN DATES BRING BACK UNEXPECTED RESULTS

33876800 CLICKING STATUS APPROVAL 'ACCEPT ALL' BUTTON FOR A PROJECT DOES NOT WORK AFTER PREVIOUSLY CLICKING 'REJECT' AND 'ACCEPT' FOR TWO OTHER CARDS

33858369 JOB_LOG_DATA ENCRYPTED WITHIN REDHAT ENTERPRISE LINUX 7

33842888 SCHEDULED SUMMARIZE JOB LOG SHOWS NULL OR ODD TEXT

33818990 20 BP - [JAVASCRIPT] ACTIVITY PAGE LOADING DELAY WITH VIEW USING WBS GROUPING AND PROJECT WITH HUGE VOLUME OF WBS ELEMENTS

33806600 CLICKING ACCEPT, REJECT, OVERRIDE, HOLD ON THE APPROVALS > STATUS UPDATES PAGE TRIGGERS A FULL DATA RELOAD WITH THE SAVE OPERATION POST REQUEST

33803631 NOTHING HAPPENS WHEN CLICKING APPLY BUTTON IN PROJECT NOTEBOOK DISCRIPTION EDIT PAGE

33747142 BUDGETED VALUES ARE NOT SHOWING CORRECTLY ON PORTFOLIOS

33718132 SCHEDULED SUMMARIZATION ERROR: THE VALUE OF ATTRIBUTE TITLE ASSOCIATED WITH AN ELEMENT TYPE DIV MUST NOT CONTAIN THE '<' CHARACTER.

33700317 LAST_RECALC_DATE DATA DOES NOT MATCH WHAT IS SHOWN IN P6

33963669 [ORACLE DB ONLY] UPGRADE SCRIPT LOGIC FROM 20.9 OR EARLIER RELEASES CAN CREATE FINANCIAL PERIOD WITH END_DATE THAT INCLUDES A TIMESTAMP OTHER THAN 00:00:00

INTG

34010671 FP - P6 WS FAILS WITH DBNGINE.PREPARESTATEMENT: CONNECTION OBJECT IS NULL. WHEN UPDATING ACTIVITY FEEDBACK

33984488 FP - IMPORT PRIMAVERA XML FAILS FOR SQL SERVER VIA WEBSERVICES

Team Member

33886358 PROJECT NAME DOES NOT DISPLAY IN TIMESHEET IN TEAM MEMBER

33909508 PERCENT COMPLETE VALUE IN TEAM MEMBER CHANGE WHEN SAVED INITIALLY

33775252 TEAM MEMBER LAST_ACTIVE_TIME AND LOGIN_DATE ALWAYS IDENTICAL

P6PRO

33871919 XML IMPORT UPDATE EXISTING NOT UPDATING WBS NAME CHANGE

33797630 NON-ADMIN SUPERUSERS GETTING AN EXCEPTION ERROR WHEN ATTEMPTING TOOLS, SCHEDULE COMPARISON IN PVD

33743911 IMPORT TAKES MULTIPLE HOURS FOR CERTAIN XER FILES

33135621 LONG START OF P6 PROFESSIONAL APPLICATION.

34047049 AFTER UPGRADE FROM VERSION 16.1 TO 20.12, CURRENT WEEK (CW) FILTERS ARE DEFECTIVE

33932807 FAILED TO LOAD IMPORTOPTIONSTEMPLATE DATA WHEN IMPORTING PRIMAVERA XML

33911123 XER IMPORT ERROR CVRCV WHEN IMPORTING XER WITH DUPLICATE RESOURCES

33723081 P6 IS DISABLING THE MENU FOR NON-INTEGRATED PROJECTS AND NOT ENABLING IT AGAIN

33721528 IMPORTING XER IS NOT DELETING ALL UNREFERENCED ACTIVITY RELATIONSHIPS

33718441 WRONG ADDED BY USER APPEARING FOR MULTIPLE PROJECTS, CUSTOMER REQUESTING HOW/WHO MADE 'ADDED BY' CHANGES

33820208 BASELINE UPDATE PERFORMANCE ISSUE

34012790 PPM JOB SERVICES FAILS XER EXPORT JOB - ERROR: ACCESS VIOLATION AT ADDRESS 0000000000F5657C IN MODULE ~PRMJOB.EXE

Oracle Primavera P6 21.12.5.0 Released

IMPORTANT UPDATE: The major patch 21.12.5.0 for P6 EPPM is now available. The following list of issues have been fixed for Primavera. To see the other released patches and updates for P6 EPPM v21.12, please visit My Oracle Support.

WEB

34155470 GROUPING BY INTERVAL SHOWS NO DATA

34115700 INTERNAL-BP:REG 22.5: EPS VIEW- PROJECT BASELINE AND BASELINE DATA DATE COLUMNS NOT DISPLAYING CORRECT VALUES WHEN MORE THAN 500 PROJECTS

34100534 APPLY ACTUALS NOT WORKING IN P6 WEB

34098919 PRE : PSS - IMPORT PROJECT WITH HAVING SINGLEQUOTE IN THE IMPORTFILENAME , THROWS VALIDATION ERROR

34084195 FILTERS THAT CONTAIN DATES BRING BACK UNEXPECTED RESULTS

34036571 JAVASCRIPT CODE CAN EXECUTE THE /P6/REST/DICTIONARIES/LOAD/FINANCIALPERIODS REQUEST PASSING AN INVALID PARAMETER VALUE TEMPLATEID=UNDEFINED

34032030 21 FP - AFTER UPGRADE FROM VERSION 16.1 TO 20.12, CURRENT WEEK (CW) FILTERS ARE DEFECTIVE

34017083 PUBLISH JOB CRASH WHEN IT LOADS A HALF DELETED PROJECT WITH NULL PROJWBS DATA

33990010 CLICKING ACCEPT, REJECT, OVERRIDE, HOLD ON THE APPROVALS > STATUS UPDATES PAGE TRIGGERS A FULL DATA RELOAD WITH THE SAVE OPERATION POST REQUEST

33934925 PRE:OBS FOR WHICH USER DOESNT HAVE ACCESS CAN BE ASSIGNED AT WBS LEVEL WHILE IMPORTING A PROJECT

33810014 GLOBAL SEARCH AND REPLACE FAILS - THE CONVERSION OF THE DATA TYPE VARCHAR TO DATETIME PRODUCED AN OUT-OF-RANGE VALUE.

33784989 INEFFICIENT STATEMENT LOADING PROJECTS > EPS PAGE WHEN PROJECT BASELINE COLUMN ADDED TO GRID AND ENVIRONMENT HAS THOUSANDS OF PROJECTS WITH A DEFINED PROJECT BASELINE

Team Member

34015547 FP - BUG 33909508 - PERCENT COMPLETE VALUE IN TEAM MEMBER CHANGE WHEN SAVED INITIALLY

SRVS

34072158 WEB SERVICES READRESOURCEASSIGNMENTSPREAD NOT WORKING

P6PRO

34166600 XER IMPORT/EXPORT NOT IMPORTING OR EXPORTING CALENDAR EXCEPTIONS, NOTEBOOK DESCRIPTIONS WHEN DATA ELEMENT EXCEEDS 4096 CHARACTERS

34094396 FP - [ORACLE DB ONLY] UPGRADE SCRIPT LOGIC FROM 20.9 OR EARLIER RELEASES CAN CREATE FINANCIAL PERIOD WITH END_DATE THAT INCLUDES A TIMESTAMP OTHER THAN 00:00:00

34084187 BASELINE UPDATE PERFORMANCE ISSUE

34084170 WRONG ADDED BY USER APPEARING FOR MULTIPLE PROJECTS, CUSTOMER REQUESTING HOW/WHO MADE ADDED BY CHANGES

34076716 PPM JOB SERVICES FAILS XER EXPORT JOB - ERROR: ACCESS VIOLATION AT ADDRESS 0000000000F5657C IN MODULE ~PRMJOB.EXE~

34070223 P6 IS DISABLING THE MENU FOR NON-INTEGRATED PROJECTS AND NOT ENABLING IT AGAIN

34067946 IMPORT XML FAILS WITH ERROR ORA-00001: UNIQUE CONSTRAINT ADMUSER.PK_TASK VIOLATED

34056584 SQL SERVER DB UPGRADE FROM 20.12.2.0 TO 21.12.3.0 FAILS - ERROR IN RUN SQL SCRIPT SSPM_P201202.SQL

34049701 LONG START OF P6 PROFESSIONAL APPLICATION.

34032447 NON-ADMIN SUPERUSERS GETTING AN EXCEPTION ERROR WHEN ATTEMPTING TOOLS, SCHEDULE COMPARISON IN PVD

34006566 IMPORTING XER IS NOT DELETING ALL UNREFERENCED ACTIVITY RELATIONSHIPS

Oracle Primavera P6 19.12.19.0 Released

IMPORTANT UPDATE: The major patch 19.12.19.0 for P6 EPPM is now available. The following list of issues have been fixed for Primavera. To see the other released patches and updates for P6 EPPM v19.12, please visit My Oracle Support.

WEB

33701453 19 BP - UPGRADE LOG4J JAR TO 2.17.1

32751746 HARD CODE HINTS TO PROJECT/PROJWBS/SUMTASK/GTT_PKLIST STATEMENT EXECUTED DURING ASSIGNMENT PAGE LOADING

INTG

33300301 THE LIVE SPREAD COMPUTING OF THE API CALCULATES WRONG VALUES

Team Member

33786943 FP - LOADING TEAM MEMBER USING NON-ENGLISH LOCALE PREVENTS TIMESHEET SUBMISSION DUE TO CLEAR ALL FILTERS POPUP

33800265 FP - TEAM MEMBER USING LANGUAGE OTHER THAN ENGLISH ARE NOT ABLE TO VIEW THE SAVE AND CANCEL BUTTONS DURING AFTER EDITING A TIMESHEET IN (NORMAL) 100% BROWSER (CHROME) ZOOM

33682563 TIMESHEET FILTER FEATURE - BACK PORTING CHANGES TO 19.12.X VERSION

SRVS

33787552 FP - P6 WS FAILS WITH ERROR THE MESSAGE CANNOT BE PROCESSED BECAUSE IT HAS EXPIRED

33749436 P6 WEB SERVICES FAILS TO UPDATE ACTIVITY RECORD UPDATE AFTER UPGRADE TO 19.12.16.0

P6PRO

33781634 COPY/PASTE A BIG PROJECT IS SLOW - SQL SERVER PPM DATABASE

33529640 IN PROJECT THRESHOLDS, UNDER DETAILS TAB, YEAR OF 'FROM DATE' & 'TO DATE' OPTIONS IS BEING DISPLAYED AS 1821 INSTEAD OF 2021 WHEN 4-DIGIT YEAR OPTION IS UNCHECKED

33760232 UNABLE TO DEFINE CRITICAL ACTIVITIES IN VISUALIZER

DBCONFIG

33458389 FP - UNABLE TO CONNECT DATABASELOGINS TOOL TO SQL SERVER WITH ENCRYPTED CONNECTION