P6-Scrubber v8 - New Release

P6-Scrubber v8 - New Release

In version 8.0, we have introduced quality assurance checks, data analysis and auto-scrubbing. Choose from pre-defined validations and create your own to match your company's needs with configurable warn/fail checks. Peruse sleek and responsive reports to see any potential issues in your projects or activities, all bundled together with regular scrubbing capabilities. Dig into schedule details with our project statistics dashboards.

Read more

CAPPS - v14 Release

CAPPS - v14 Release

Introducing CAPPS Version 14.0.

This new version introduces crosstab views, a Gantt chart tab, and Project Data Dashboards. Crosstab views are perfect for project managers, offering quick and easy activity and step progression that can even be done from your phone or mobile device. The Gantt chart allows for a complete view of your activities along a timeline, right from inside CAPPS. Finally, check out our new project data dashboards, built specifically for project managers.

Read more

Upcoming Free Webinars

Upcoming Free Webinars

Upcoming Webinars - Register Now to Join!
  • P6-Scrubber v8 New Release - March 10, 7-8pm MDT
  • P6-Scrubber v8 New Release - March 11, 9-10am Philippine Standard Time
  • BI-GanttView - March 18, 10-11am MDT
  • CAPPS v14 New Release - March 26, 10-11am MDT
  • OPC-Integrator - April 1, 10-11am MDT

Read more

Upcoming Online Training

Upcoming Online Training

Join one of our upcoming, live online training courses for Primavera P6, OPC or Safran Risk.
  • Introduction to OPC - Jan 21-22
  • Primavera P6 Basic - Jan 26-30
  • Primavera P6 Advanced - Feb 9-11
  • Administration in OPC - Feb 18-19

Read more

CAPPS - v13 Release

CAPPS - v13 Release

Introducing CAPPS Version 13.0

Version 13 of CAPPS comes with a completely redesigned and easier to use UI, sophisticated team and user management, better filter and layout management, improved business rule processing in the grid, performance improvements, and more.

Read more

P6-Scrubber v7 - New Release

P6-Scrubber v7 - New Release

In version 7, we added support for scrubbing role codes, revamped the simple scrub dialog (and added new simple scrub areas), and added the ability to apply a dynamic prefix to both IDs and hierarchies in the simple scrub area.

Read more

P6-Loader v15 - New Release

P6-Loader v15 - New Release

In this release of P6-Loader v15, Emerald has added additional UDF merging options for better control. Layouts and filter controls have been greatly expanded, with a layout usage sheet and loader sheet to deal with user layouts. Resources can now be remapped when copying layouts.

Read more

CAPPS - v12 Release

CAPPS - v12 Release

Introducing CAPPS Version 12.0

Version 12 of CAPPS comes with a variety of new features and improvements, including greater grid functionality and adaptability, better clarity, and the addition of a baseline development tab.

Read more

Unifier v24 - New Release

Unifier v24 - New Release

The new Unifier v24.12 update adds significant new features and improvements to make the user experience smoother and easier, including changes to integration, documents and attachments, importing data, the mobile application, and many more.

Read more

P6 v24 - New Release

P6 v24 - New Release

With the new release of P6 v24 comes a flood of enhancements and new features that make P6 better and easier to use than ever! From a new, simple way to unlink your activities in P6 Client, to a whole new view for timesheets in Team Member, take a look at a few of our favorite new additions.

Read more

P6-Loader v14 - New Release

P6-Loader v14 - New Release

Better resource assignment and unique loading options, record action column, and backup of layouts

Read more

P6-Loader v13 - New Release

P6-Loader v13 - New Release

Easier Hierarchies and Fragnet Templating

Read more

P6-QA v8 - New Release

P6-QA v8 - New Release

Your P6-QA metrics are now available in Power BI reports. You can also create custom reports via our P6-Reporter tool in your corporate dashboards. These reports include time based metrics to help you see where in your project these quality issues exist.

Read more

P6-Calculator v7 - New Release

P6-Calculator v7 - New Release

Easily Manage Key Resources and Mandatory Activities in P6!

Read more

Safran Risk v22.2.0 - New Release

Safran Risk v22.2.0 - New Release

Safran Risk has released v22.2.0. Read about all the exciting new features.

Read more

P6-Auditor v5 - New Release

P6-Auditor v5 - New Release

Our latest version of P6-Auditor has a new look and feel making auditing definitions easier and faster to build.

Read more

Safran Risk v22.1.0 - New Release

Safran Risk v22.1.0 - New Release

Safran Risk has released v22.1.0. Read about all the exciting new features.

Read more

P6-Scrubber v6 - New Release

P6-Scrubber v6 - New Release

In version 6, we added notebook type scrubbing and also made improvements to the P6-Scrubber user interface, reports and functionality in general.

Read more

P6-Calculator v6.4 - New Release

P6-Calculator v6.4 - New Release

Easily Manage Key Resources and Mandatory Activities in P6!

Read more

P6-Scrubber v5 - New Release

P6-Scrubber v5 - New Release

Work online or offline to define and scrub your XER files and now, in the new release, XML files. Version 5 makes scrubbing files even easier for schedulers.

Read more

Oracle Primavera P6 21.12.4.1 Released

IMPORTANT UPDATE: The interim patch 21.12.4.1 for P6 EPPM is now available. The following list of issues have been fixed for Primavera. To see the other released patches and updates for P6 EPPM v21.12, please visit My Oracle Support.

34135992 XER IMPORT/EXPORT NOT IMPORTING OR EXPORTING CALENDAR EXCEPTIONS, NOTEBOOK DESCRIPTIONS WHEN DATA ELEMENT EXCEEDS 4096 CHARACTERS

Oracle Primavera P6 21.12.3.0 Released

IMPORTANT UPDATE: The major patch 21.12.3.0 for P6 EPPM is now available. The following list of issues have been fixed for Primavera. To see the other released patches and updates for P6 EPPM v21.12, please visit My Oracle Support.

WEB

33928865 INTERNAL-FP:BASELINE ASSIGNMENTS LOST AFTER IMPORTING PRIMAVERA XML

33865090 ENABLE USERNAME TOKEN BASED AUTHENTICATION IN P6 PRIMAVERA CONNECTOR 20.12

33899265 21 FP - NOTHING HAPPENS WHEN CLICKING APPLY BUTTON IN PROJECT NOTEBOOK DISCRIPTION EDIT PAGE

33840366 LAST_RECALC_DATE DATA DOES NOT MATCH WHAT IS SHOWN IN P6

33837182 ERROR: USER DOES NOT HAVE LICENSE OF TYPE WEB_PM WHEN ACCESSING ACTIVITIES PAGE AS CONTRIBUTOR

33830633 APPROVALS > STATUS UPDATES PAGE EXECUTING INEFFICIENT INCORRECT TASKACTV/UDFVALUE STATEMENTS

33795687 CANNOT CLEAR REJECTED STATUS UPDATE

33865509 UNEXPECTED RESULTS IN THE WBSHIERARCHY TABLE IN REFERENCE TO THE PARENTLEVELSBELOWROOT AND CHILDDLEVELSBELOWROOT COLUMNS

P6PRO

33917649 ERROR ORA-01400: CANNOT INSETT NULL INTI ADMUSER.FILTPROP.TABLE_NAME WHEN SAVING LAYOUT AS USER LAYOUT

33837972 CONFLICTING SCHEDULE OPTIONS PROMPT AFTER ENABLING/DISABLING THE LOG TO FILE PARAMETER THEN SCHEDULING MULTIPLE OPEN PROJECTS

33699424 AVAA0 ERROR WHILE OPENING A SPECIFIC LAYOUT WITH MULTIPLE PROJECTS SELECTED

33643321 COPY/PASTE A BIG PROJECT IS SLOW IN PPM - SQL DATABASE

32996854 TOTAL ACTIVITY COUNT IN WBS VIEW NOT UPDATED CORRECTLY

33911158 XER IMPORT ERROR CVRCV WHEN IMPORTING XER WITH DUPLICATE RESOURCES

33889967 XML IMPORT - (ADMUSER.FK_OBSPROJ_OBS) VIOLATED - PARENT KEY NOT FOUND

33865350 GROUPING ACTIVITIES BY START DATE WITH DAY INTERVAL IN P6 PROFESSIONAL SHOWS INCORRECT DATE FORMAT

33835991 UDF FIELDS APPEARING IN XER THAT DO NOT EXIST IN DATABASE

33820402 IN P6 PRO THE RESOURCE USAGE PROFILE OPTIONS SECTION FOR RESOURCE FILTER / GROUP NAMES ONLY SUPPORTS UP TO 50 UNIQUE FILTER GROUP NAMES

33794884 MSP TEMPLATE CREATES INVALID NOTES TAG FOR MSP XML EXPORT THAT CAUSES FILE CORRUPTION

33794479 EMPTY WBS NODE BECOMES AN ACTIVITY WHEN EXPORTED TO MSP XML

33794438 CODE LEVEL CHANGES FOR BUG 33552097 - HELP WITH MOVING ACTIVITY CODES AND CALENDARS FROM GLOBAL/EPS LEVEL TO PROJECT LEVEL

33760203 UNABLE TO DEFINE CRITICAL ACTIVITIES IN VISUALIZER

33714195 P6 PROFESSIONAL UNABLE TO CONNECT DATABASE ERROR WHEN WINDOWS REGIONAL SETTING SET TO TURKISH

33605603 USING P6 PROFESSIONAL CLICKONCE STAGE ENVIRONMENT, AFTER OPENING PROJECT FOLLOWED BY CLOSE ALL RESULTS IN AVAA0 ERROR

Oracle Primavera P6 20.12.13.0 Released

IMPORTANT UPDATE: The major patch 20.12.13.0 for P6 EPPM is now available. The following list of issues have been fixed for Primavera. To see the other released patches and updates for P6 EPPM v20.12, please visit My Oracle Support.

WEB

33812477 CANNOT EDIT FUTURE PERIOD SPREADSHEET BUCKETS FOR PLANNED UNITS AND EARLY REMAINING UNITS IN P6 EPPM (RESOURCES TAB > ASSIGNMENTS PAGE)

33792578 APPROVALS > STATUS UPDATES PAGE EXECUTING INEFFICIENT/INCORRECT TASKACTV/UDFVALUE STATEMENTS

33783284 WHY ARE THE PRIVILEGES REQUIREMENTS DIFFERENT BETWEEN CLIENT AND WEB WITH REGARD TO COPYING A READ-ONLY PROJECT?

33774152 GLOBAL SEARCH AND REPLACE FAILS - THE CONVERSION OF THE DATA TYPE VARCHAR TO DATETIME PRODUCED AN OUT-OF-RANGE VALUE.

33767857 DIFFERENT RESOURCE MANAGER CAN APPROVE TIMESHEET BY SWITCHING VIEWS IN APPROVAL PAGE

33733128 20 BP - HIERARCHICAL ASSIGNMENT CODE VALUES NOT RETAINED AFTER SAVE IF APPLIED VIA FILL DOWN

33706449 FP COULD NOT FIND THE CONTEXT WBS FOR SECURITY CHECKING. {1} MIGHT NOT EXIST.

33701461 20 BP - UPGRADE LOG4J JAR TO 2.17.1

33676475 PROJECT CODES ARE NOT GROUPING PROPERLY IN SCORECARDS

33643447 PORTUGUESE LANGUAGE TRANSLATION NOT 100% ON PROJECTS TAB, EPS PAGE AND ACTIONS MENU ITEMS

33643026 DUPLICATE PROJECT CODES WHILE IMPORTING XML USING NEW NAME FEATURE IN IMPORT TEMPLATE

33641091 RECENT USER ACTIVITY VIEW DOES NOT POPULATE ALL THE COLUMN DATA

33640485 ACTIVITY PAGE GRIDDATA/LOAD STATEMENT LOADING PROJECTS WITH TWO TASK TABLE SUBQUERIES CAUSING PERFORMANCE DEGRADATION

33633440 RISK RESPONSE PLAN WILL NOT STAY ACTIVE

33630721 DELETED RELATIONSHIPS REAPPEAR AFTER RELATIONSHIP CHANGES SAVED

33612641 MSP PROJECTS IMPORT INTO P6 WITH PERCENT COMPLETE TYPE SET TO PHYSICAL EVEN THOUGH IT IS SET TO DURATION ( % COMPLETE) IN MSP

33416712 SQL SERVER: BUG 33368214 - FULLPATHNAME IN RESOURCEHIERARCHY IS NOT CORRECT

33416686 PRE2012: THE FULL PATH NAME OF LAST 2 LEVELS FOR ANY CHILD IS SAME IN RESOURCEHIERARCHY TABLE .

33217532 INVALID PATH WAS REQUESTED WHEN OPENING BUBBLE CHART WITH LABOR UNITS MORE THEN 999 HOURS

32842965 CANNOT CLEAR REJECTED STATUS UPDATE

33809255 ONLINE INDEX BUILD FAILS WITH ORA-00439: FEATURE NOT ENABLED

33654575 UNEXPECTED RESULTS IN THE WBSHIERARCHY TABLE IN REFERENCE TO THE PARENTLEVELSBELOWROOT AND CHILDDLEVELSBELOWROOT COLUMNS

Team Member

33655221 BASELINE DATES DON'T SHOW IN TIMESHEETS FOR ACTIVITIES THAT WERE AUTOMATICALLY ADDED

33507961 FP - TIMESHEET SUBMISSION ERROR - TOTAL HOURS CANNOT EXCEED 24 HOURS PER DAY

SRVS

33654866 CUSTOMER WIPED PAUDITX BUT WHEN AUDIT DATA IS REPUBLISHED IT ONLY TOOK AUDIT DATA FROM THE DAY OF THE REPUBLISH

33667063 AFTER UPGRADING TO 20.12.9 P6 WS FAILS WITH ERROR THE MESSAGE CANNOT BE PROCESSED BECAUSE IT HAS EXPIRED

P6PRO

33643306 COPY/PASTE A BIG PROJECT IS SLOW IN PPM - SQL DATABASE

33531556 APPLICATION GENERATE ERROR VQCCR-2757-D WHEN GROUP USER BY GLOBAL SECURITY PROFILE

33449343 UNEXPECTED CENTURY DATE DISPLAYED WHEN USING 2-DIGIT YEARS IN THE FUTURE FOR CONSTRAINTS DATE DIALOG BOX

33155621 CONFLICTING SCHEDULE OPTIONS PROMPT AFTER ENABLING/DISABLING THE LOG TO FILE PARAMETER THEN SCHEDULING MULTIPLE OPEN PROJECTS

33760224 UNABLE TO DEFINE CRITICAL ACTIVITIES IN VISUALIZER

33714783 MSP TEMPLATE CREATES INVALID NOTES TAG FOR MSP XML EXPORT THAT CAUSES FILE CORRUPTION

33674499 ENABLE PUBLICATION SETTING IS DISABLED AFTER MERGING REFLECTION PROJECT INTO SOURCE PROJECT

33664490 ERROR EXPORT PROJECT XML

33615178 PUBLISH PROJECT WEBSITE IS SLOW - BACKPORT IN 20.12

33596914 P6 PROFESSIONAL LINK TO UNIFIER THROWS ERROR 'NF(-'-3940-8 NOT FOUND (404)

33546964 GROUPING ACTIVITIES BY START DATE WITH DAY INTERVAL IN P6 PROFESSIONAL SHOWS INCORRECT DATE FORMAT

33466700 EMPTY WBS NODE BECOMES AN ACTIVITY WHEN EXPORTED TO MSP XML

33433490 THE 'ACTIVITY RESOURCE ASSIGNMENTS' STAGE OF AN XER IMPORT TAKES ABOUT 80% OF THE TOTAL IMPORT TIME.

DBCONFIG

33458464 FP - UNABLE TO CONNECT DATABASELOGINS TOOL TO SQL SERVER WITH ENCRYPTED CONNECTION

Oracle Primavera P6 21.12.2.0 Released

IMPORTANT UPDATE: The major patch 21.12.2.0 for P6 EPPM is now available. The following list of issues have been fixed for Primavera. To see the other released patches and updates for P6 EPPM v21.12, please visit My Oracle Support.

WEB

33823000 FP - WHY ARE THE PRIVILEGES REQUIREMENTS DIFFERENT BETWEEN CLIENT AND WEB WITH REGARD TO COPYING A READ-ONLY PROJECT?

33817665 FP - ACTIVITY PAGE GRIDDATA/LOAD STATEMENT LOADING PROJECTS WITH TWO TASK TABLE SUBQUERIES CAUSING PERFORMANCE DEGRADATION

33813108 FP - DIFFERENT RESOURCE MANAGER CAN APPROVE TIMESHEET BY SWITCHING VIEWS IN APPROVAL PAGE

33799002 21 FP - DELETED RELATIONSHIPS REAPPEAR AFTER RELATIONSHIP CHANGES SAVED

33794393 MSP PROJECTS IMPORT INTO P6 WITH PERCENT COMPLETE TYPE SET TO PHYSICAL EVEN THOUGH IT IS SET TO DURATION ( % COMPLETE) IN MSP

33794370 RISK RESPONSE PLAN WILL NOT STAY ACTIVE

33794344 TIMESHEET TOTALS IN P6 WEB NOT SHOWING TOTALS FOR FIRST OR LAST DAY OF TIMESHEET PERIOD

33787780 21 FP - DUPLICATE PROJECT CODES WHILE IMPORTING XML USING NEW NAME FEATURE IN IMPORT TEMPLATE

33780137 PROJECT CODE VALUES BLANK WHEN MULTIPLE PROJECTS OPENED IN EPS PAGE

33765614 FULL PATH NAME IN RESOURCEHIERARCHY TABLE ARE NOT CORRECT

33751376 REG-FILLDOWN AN EMPTY VALUE WITHOUT SAVING IS NOT HAPPENING

33730716 [JAVASCRIPT] ACTIVITY PAGE LOADING DELAY WITH VIEW USING WBS GROUPING AND PROJECT WITH HUGE VOLUME OF WBS ELEMENTS

33797582 ACTIVITY LEVEL PROJECT SECURITY PRIVILEGE 'DELETE DISCUSSION COMMENTS' IS NOT EXPOSED IN P6 WEB SERVICES

33730609 ORPM_ADMUSER_UPGRADE.SQL CAN FAIL WITH ORA-00439: FEATURE NOT ENABLED: ONLINE INDEX BUILD WHEN RUN AGAINST AN ORACLE STANDARD EDITION DATABASE

Team Member

33788481 BASELINE DATES DON'T SHOW IN TIMESHEETS FOR ACTIVITIES THAT WERE AUTOMATICALLY ADDED

SRVS

33763857 FP - CUSTOMER WIPED PAUDITX BUT WHEN AUDIT DATA IS REPUBLISHED IT ONLY TOOK AUDIT DATA FROM THE DAY OF THE REPUBLISH

P6PRO

33844667 P6 PROFESSIONAL LINK TO UNIFIER THROWS ERROR 'NF(-'-3940-8 NOT FOUND (404)

33667966 THE 'ACTIVITY RESOURCE ASSIGNMENTS' STAGE OF AN XER IMPORT TAKES ABOUT 80% OF THE TOTAL IMPORT TIME.

33654104 ROW HEIGHT CHANGES NOT WORKING CORRECTLY.

Oracle Primavera P6 21.12.1.0 Released

IMPORTANT UPDATE: The major patch 21.12.1.0 for P6 EPPM is now available. The following list of issues have been fixed for Primavera. To see the other released patches and updates for P6 EPPM v21.12, please visit My Oracle Support.

WEB

33748157 FAILED TO LOAD AVESAPI.PROPERTIES AS A CLASSLOADER RESOURCE WHEN UPGRADING FROM 21.12TO 21.12.1

33717305 FP - INVALID PATH WAS REQUESTED WHEN OPENING BUBBLE CHART WITH LABOR UNITS MORE THEN 999 HOURS FOR RUSSIAN

33685213 HIERARCHICAL ASSIGNMENT CODE VALUES NOT RETAINED AFTER SAVE IF APPLIED VIA FILL DOWN

33673745 USING FILL DOWN IN P6 WEB TO UNCHECK ENABLE SUMMARIZATION PRODUCES SEVERAL POPUPS

33662844 FP DOWNLOAD FILE FROM NOTIFICATION WINDOW DOES NOT WORK WHEN ATTEMPTING TO DOWNLOAD A REPORT

33658376 INTERNAL-FP:NULL FOR FINISHDATE IN P6BLPROJECT, NULL FOR STARTDATE AND FINISHDATE IN P6BLWBS

33657218 RECENT USER ACTIVITY VIEW DOES NOT POPULATE THE COLUMN DATA - SQL SERVER DB

33618878 FP - PORTFOLIO VIEW SCORECARD PORTLETS FAILING TO LOAD WITH JAVA.LANG.NULLPOINTEREXCEPTION POST UPGRADE FROM 19.12.X

33615630 21 FP - EXPORT LANGUAGE IS DIFFERENT THAN LANGUAGE SELECTED DURING LOGIN.

33610271 RESOURCE ASSIGNMENTS VIEW NOT GROUPING BY HIERARCHY IN P6 WEB

33560111 FP BUG 33390566 - COULD NOT FIND THE CONTEXT WBS FOR SECURITY CHECKING. {1} MIGHT NOT EXIST.

33546668 GLOBAL SEARCH AND REPLACE ONLY USES FIRST VALUE IN THE COMMA SEPARATED VALUES

33539485 PORTUGUESE LANGUAGE TRANSLATION NOT 100% ON PROJECTS TAB, EPS PAGE AND ACTIONS MENU ITEMS

Team Member

33532370 IF A SUBMITTED STATUS UPDATE IS REJECTED AND THE SAME ACTIVITY (W/ REJECTED STATUS) IS VIEWED IN ACTIONS REQUIRED PAGE THE ERROR - TEAMMEMBER_ERROR_GENERIC DISPLAYS

33497414 STATUS UPDATES FOR REMAINING DURATION AND PERCENT COMPLETE RESETS ORIGINAL DURATION

SRVS

33565049 DUPLICATE SUMTASK ROWS CAN CAUSE PROJECT PUBLICATION STEP 34 TO FAIL WITH ORA-00001: UNIQUE CONSTRAINT (ADMUSER.PK_PROJECTX) VIOLATED

33732400 FP - AFTER UPGRADING TO 20.12.9 P6 WS FAILS WITH ERROR THE MESSAGE CANNOT BE PROCESSED BECAUSE IT HAS EXPIRED

33638813 FP - P6 WEB SERVICES READACTIVITIES FAILS WHEN INCLUDING BASELINE FIELDS

33717259 P6 WEB SERVICE RETURNS A GENERAL ERROR WITHOUT STACKTRACE

33628234 21 FP - PROJECT LASTUPDATEDATE HAS DIFFERENT VALUES BETWEEN P6 WEB SERVICES AND PDS / PX.

33621970 DELETERESOURCEASSIGNMENTPERIODACTUALS RETURNS A GENERAL ERROR WITHOUT STACKTRACE

33618858 FP - TEMPLATEWBSOBJECTID PARAMETER FROM PROJECTSERVICE > COPYWBSFROMTEMPLATE OPERATION ALLOWS A WBS_ID VALUE FOR A NON-TEMPLATE PROJECT OR EPS

P6PRO

33679335 AFTER THE UPGRADE USER CAN'T SELECT OPTION FROM PAGE SETUP.

33661180 LAYOUT ELEMENTS FAIL TO DRAW AS SELECTED

33449361 UNEXPECTED CENTURY DATE DISPLAYED WHEN USING 2-DIGIT YEARS IN THE FUTURE FOR CONSTRAINTS DATE DIALOG BOX

33389489 P6 PROFESSIONAL APPLICATION FREEZES WHILE LOADING PROJECT LEVEL LAYOUTS WHEN PROJECT LAYOUT CONTAINS TOTAL COST COLUMNS

33674509 ENABLE PUBLICATION SETTING IS DISABLED AFTER MERGING REFLECTION PROJECT INTO SOURCE PROJECT

33664528 ERROR EXPORT PROJECT XML

33649339 IMPORT EXCEL XLSX FAILS WHEN UPDATING MILESTONES RELATIONSHIPS

33640853 THE APPLICATION DOESN'T RESPOND WHEN IT IS OPENED ON THE SECONDARY MONITOR.

33615739 21 FP - PERIOD DATA AT ACTIVITY LEVEL LOST WHEN COPY/PASTING PROJECT

33593367 FP XML IMPORT IS VERY SLOW

33471845 EMPTY EPS NODES HIDDEN WHEN ADDITIONAL GROUPING CRITERIA IS USED

33422096 AVAA ERROR IMPORTING ACTIVITIES FROM EXCEL

33378497 EVENT CODE: LIOOB-3638-4 WHEN IMPORTING AN XML WITH MULTIPLE BASELINES

33723294 SQLITE DATABASE(S) UNABLE TO UPGRADE TO 21.12

ADMIN

33654138 FP - UPGRADE SCRIPT MISSING LOGIC TO CREATE NDX_PROJWBS_1 AS A LOCAL INDEX IF PARTITIONING ENABLED

33708508 FP - UNABLE TO CONNECT DATABASELOGINS TOOL TO SQL SERVER WITH ENCRYPTED CONNECTION